ON
ON Semiconductor
Power and sensing semiconductor supplier focused on automotive, industrial, image sensors, silicon carbide, and power-management devices.
Wide-bandgap and power-electronics socket migration
The thesis has not cleared its decision gate. Preserve attention, not capital, until the next proof point resolves it.
-26.4% vs average-estimate implied market cap; 2026-12-31 average EPS estimate, 20 EPS analysts.
- Fwd P/E
- 23.1×
- P/E TTM
- 46.64×
- Avg P/E
- 31.39×
- Gap
- -26.4%
- EPS gr.
- -92%
- Rev gr.
- -12%
The current price leaves room for a re-rating if forward estimates remain credible.
0% proposed, two-to-four quarters. Missing current implied expectations, valuation scenarios, survival review and observed price confirmation; no fabricated entry/no-chase/trim/exit prices or arithmetic. Paid adoption/cash margins required; qualification delay, substitution and margin erosion falsify.
Showing 4 signal pivots; 68 repetitive daily notes hidden.
- WATCH ONLY
0% proposed; two-to-four-quarter paid-deployment/revenue/margin test. Missing current closes, implied growth, scenario values and survival underwriting; no invented entry/no-chase/risk-exit levels or scenario arithmetic. Qualification failure, inferior system economics or competitive margin erosion falsifies the case.
AI financing versus per-share value; Brazil fiscal repricing; 900 V GaN - WATCH ONLY / Reassessment
common-equity research, 0% incremental. Candidate variant: qualified conversion efficiency and system integration retain more profit than generic capacity. Current multiple, implied growth/margins, debt/liquidity review, closing-price confirmation and base/bear valuation remain missing. No entry/no-chase/risk-exit levels fabricated. No broker queried and no order action.
AI cash-conversion shock; GaN mechanism gains primary evidence - research queue only; no orders; REASSESS WATCH ONLY; ETN existing hold, no add; IFNNY proposed 0%
Microsoft's 167-kW rack gives grid-to-rack conversion more addressable watts, and Infineon has a named Eaton SiC device relationship; buyer-specific economics still unpriced here. Watch paid MVSST/800-VDC installations and incremental gross margin, not equipment announcements
Oil-route evidence meets Microsoft's inference-per-watt pivot - research only; no executable tickets; NEW / WATCH ONLY, proposed size 0%
possible 30-year capital may avert a near-term funding squeeze in U.S. SiC substrate/device supply; this is a policy-capital repricing, not a data-center power-device order. Price faded despite premarket enthusiasm, and up-to-7.5% warrants plus secured debt may divert economics from common equity. Variant to test: tranche funding plus qualified SiC/GaN customer volumes lift operating FCF more than dilution, interest and ramp cost. Catalyst: definitive loan terms, funded tranches and customer revenue
Oil and chip-duration divergence; conditional SiC funding is not a device order